LI-ION BATTERY EQUIPMENT & AUTOMATIONVADODARA, INDIA · INTERNATIONAL ENQUIRIES
AI-generated representative concept. Not a photograph of a completed Amplemech Battery Equipment & Automation machine. Controlled-atmosphere battery research handling equipment family.
AI-generated representative concept. Not a photograph of a completed Amplemech Battery Equipment & Automation machine.
Li-ion Laboratory EquipmentAMB-GBX-D2Partner-Supplied

Argon / Nitrogen Glove Box

Intended as a discussion scope for enclosed handling of moisture- or oxygen-sensitive battery materials, using a gas and purification arrangement selected for the process.

Intended partner-supply route only. No named partner appointment, authorisation, available machine, scope or delivery is confirmed by this listing.

Technical Specifications

Argon / Nitrogen Glove Box — indicative configuration
ParameterIndicative Configuration
Equipment typeLaboratory Inert Atmosphere Glove Box
Model variantsBasic / Purified / Dual Workstation
Working gasArgon / Nitrogen, application-dependent
WorkstationTwo-glove or four-glove
Single chamber dimensionsApprox. 1200 × 750 × 900 mm
Dual chamber dimensionsApprox. 1800–2400 × 750 × 900 mm
Chamber materialSS304; SS316L optional
Chamber wall thicknessPreliminary 3 mm, design-dependent
Viewing windowSealed transparent engineered panel
GlovesButyl rubber or process-compatible alternative
Glove port diameterTarget 200–220 mm
Oxygen levelTarget below 1 ppm, purified version only
Moisture levelTarget below 1 ppm, purified version only
Gas circulationClosed-loop, purified version
Circulation flowPreliminary 20–90 m³/h, configuration-dependent
Gas purificationRegenerable O₂/H₂O purifier, purified version
Oxygen measurementDigital O₂ analyser
Moisture measurementDigital H₂O analyser
Pressure controlTarget ±10 mbar, subject to operating limits
Pressure monitoringDigital differential pressure sensor
Main transfer chamberApprox. Ø350–400 × 500–600 mm
Small transfer chamberOptional
Transfer operationVacuum / inert-gas purge
Vacuum pumpExternal suitable vacuum pump
Purifier regenerationSupplier-engineered automatic regeneration option
Control systemPLC/HMI for purified version; simpler control for basic version
Pressure foot controlOptional
Power supply230 V / 415 V AC, configuration-dependent
Internal accessoriesElectrical feedthroughs, weighing balance, crimper integration
SafetyPressure safeguards, gas alarms, oxygen-deficiency and regeneration safety assessment
ApplicationCoin-cell assembly, battery R&D and atmosphere-sensitive material handling

Specifications represent preliminary configurable design targets. Final parameters, material compatibility, performance and availability will be confirmed after application review and engineering validation.

Proposed model configurations

ModelConfiguration
AMB-GB-BBasic Inert-Gas Glove Box
AMB-GB-PPurified Inert-Atmosphere Glove Box
AMB-GB-DDual-Workstation Glove Box

The basic purge-only model has no below-1-ppm oxygen or moisture claim. Below-1-ppm values are unvalidated targets for a suitable purified configuration only. A dual workstation does not by itself establish purification performance. Monitoring, purification and integration options are selected for the agreed configuration.

Intended operating principle

A configurable inert-atmosphere workstation is intended for battery research, coin-cell assembly and moisture-sensitive laboratory processes. The proposed range offers customisable chamber dimensions, application-dependent argon or nitrogen configurations, transfer chambers and laboratory-equipment integration. The basic version uses inert-gas purging; the purified version adds a selected circulation and purification arrangement. Enclosure integrity, process load and operating practices affect atmosphere conditions; no achieved purification or leak-rate performance is established.

Principal applications

Coin-cell assembly, battery R&D, moisture-sensitive laboratory processes and atmosphere-sensitive material handling with customer-specific workspace and equipment-integration requirements. Confirm the intended process, materials and acceptance method during application review.

Configuration & integration

Mechanical interfaces, operating mode and control requirements are defined during engineering review. Available configuration choices depend on the agreed equipment scope.

  • Basic inert-gas purge configuration
  • Purified inert-atmosphere configuration
  • Dual-workstation configuration
  • Customisable chamber dimensions and transfer chambers
  • Optional oxygen and moisture monitoring
  • Electrical feedthroughs and laboratory-equipment integration

The basic version uses a simpler control arrangement; PLC/HMI is proposed for the purified version. Oxygen and moisture analysers, pressure controls, accessories and regeneration automation are selected to suit the configuration. Purifier capacity, regeneration arrangement, circulation rate and sensor specifications require engineering and supplier selection.

Utilities & installation

Final configuration follows review of the customer process, workspace, gas-purity requirements and equipment interfaces. Inert-gas supply, evacuation, venting, power, exhaust and optional regeneration services require application-specific design. This enquiry-led listing does not establish current manufacture, completed testing, stock or immediate dispatch.

Engineering & safety considerations

Pressure limits, enclosure integrity, glove and seal compatibility, gas alarms and oxygen-deficiency controls require engineering assessment. Purification and leak-rate performance require configuration-specific validation. Solvent handling, hydrogen-based regeneration and ignition or explosion hazards require documented process and supplier safety assessment; no certified purification, solvent safety, hydrogen-regeneration safety or explosion protection is claimed.

A documented risk assessment, guarding review, material compatibility check and application-specific operating procedure are required before use. No CE, UL, IEC, hazardous-area approval or other certification is established by this listing. Conformity documentation depends on the agreed scope and destination requirements.

Read the Product Information Disclaimer

Typical engineering workflow

  1. Define the input materials, geometry and process objective.
  2. Agree the configuration, interfaces and safety requirements.
  3. Establish a trial plan and measurable acceptance criteria.
  4. Confirm technical scope before a quotation or delivery commitment.

Technical documentation

Request technical documentation and an application-specific configuration with your enquiry.

Questions about this equipment

Is this equipment available for immediate delivery?

Intended partner-supply route only. No named partner appointment, authorisation, available machine, scope or delivery is confirmed by this listing. Please request the current engineering and supply status.

Can the configuration be adapted to our application?

Share your materials, required capacity, process constraints and acceptance criteria. The team will review feasibility before confirming any custom scope.

Continue exploring

Related equipment